Map - Calibre Drilling Intersects 19.2 Metres Grading 223.4 g/t Silver and 9.44 Metres Grading 488.6 g/t Silver on the Blag Gold-Silver Vein System, Eastern Borosi Project, Nicaragua July 20, 2015