news

News

January 21, 2015  Calibre Mining Updated Drilling Results Plan Map.
January 14, 2015  Calibre Mining Announces Additional Trenching Results Including 8.45 Metres Grading 3.42 g/t Gold from the 100% Owned Montes de Oro Gold Project, Nicaragua
January 14, 2015  Calibre Mining Montes De Oro Plan Maps
December 01, 2014  Calibre Appoints Julie Lassonde to Board of Directors
November 04, 2014  Calibre Mining Drilling Results Plan Map
November 04, 2014  Calibre Mining Announces Additional Drilling Results from the Eastern Borosi Gold-Silver Project Including 6.37 Metres Grading 4.11 g/t Gold and 235.90 g/t Silver
October 28, 2014  Calibre Mining and B2Gold Begin Diamond Drilling Program at the Minnesota Gold Project, Borosi Concessions, Nicaragua
October 20, 2014  Calibre Mining and B2Gold to Start Diamond Drilling Program at the Minnesota Gold Project, Borosi Concessions, Nicaragua
October 16, 2014  Calibre Mining Announces Expanded Drilling Program and Additional Drilling Results at the Eastern Borosi Gold-Silver Project, Nicaragua
October 16, 2014  Eastern Borosi Project Drill Plan Map
October 09, 2014  Calibre Announces Grant of Stock Options
September 29, 2014  Calibre Mining Commences Trenching and Ground Geophysics on 100% Owned Montes de Oro Gold Project, Nicaragua
September 29, 2014  Calibre Mining 100% Owned Montes De Oro Map September 29,2014
September 24, 2014  Calibre Mining Announces Additional Drilling Results at the Eastern Borosi Gold-Silver Project, Nicaragua, including 6.5 Metres Grading 16.9 g/t Gold
September 24, 2014  Eastern Borosi Project Drill Plan Map
September 23, 2014  Calibre Closes $2,000,000 Strategic Financing With Pierre Lassonde Acquiring An 11% Stake In Calibre
September 17, 2014  Calibre Announces $2,000,000 Strategic Financing By Pierre Lassonde Representing An 11% Stake In The Company
September 04, 2014  Calibre Mining Engages Torrey Hills Capital for U.S. Investor Relations
September 02, 2014  Calibre Mining Announces Drilling Results at the Eastern Borosi Gold-Silver Project, Nicaragua, including 4.81 Metres Grading 25.7 g/t Gold
September 02, 2014  Eastern Borosi Project Drill Plan Map
July 28, 2014  B2Gold Increases Ownership in Calibre Mining to 15.2% by Exercising Warrants
July 24, 2014  Calibre Mining Corp. Announces Results of Annual General and Special Meeting
July 16, 2014  Calibre Announces Grant Of Stock Options
July 14, 2014  Calibre Mining Starts 3400 metre Drill Program on the Eastern Borosi Gold-Silver Project, Nicaragua
July 14, 2014  IAMGOLD and Calibre Mining diamond Drill Plan map
July 08, 2014  Calibre and B2Gold extend Trench Intercept to 61.9 metres grading 1.76 g/t Gold at the Minnesota Gold Project, Borosi Concessions, Nicaragua
July 08, 2014  Minnesota Soil and Trench Map Detail
June 23, 2014  Calibre Mining Announces 3400 metre Drill Program on the Eastern Borosi Project, Nicaragua
June 17, 2014  Calibre Mining and B2Gold Trench Extension location Map
June 17, 2014  Calibre and B2Gold Trench Extension intercepts 30.5 metres grading 2.01 g/t Gold at the Minnesota Gold Project, Borosi Concessions, Nicaragua
May 27, 2014  Calibre and IAMGOLD Sign Option Agreement on the Eastern Borosi Project, Nicaragua
May 27, 2014  Borosi Concessions - Joint Venture Map
May 07, 2014  Calibre and B2Gold Trenching Returns 14.8 Metres Grading 1.85 g/t Gold at the Minnesota Gold Project, Borosi Concessions, Nicaragua
April 29, 2014  Calibre to Amend Warrants
February 18, 2014  Calibre and B2Gold Initiate Trenching Program on the Minnesota Gold-Copper Project, Borosi Concessions, Nicaragua
January 23, 2014  Trenching and Pitting on Calibre's 100% Owned Montes de Oro Project Extends Gold Mineralization 250 metres to the North
November 20, 2013  Montes De Oro Map
November 20, 2013  Trench Extension at Calibre's 100% Owned Montes de Oro Project Returns 33.5 Metres Grading 2.1 g/t Gold
October 17, 2013  Calibre and Joint Venture Partners Continue Advancing Gold-Silver-Copper Projects on the Borosi Concessions, Northeast Nicaragua
October 07, 2013  Calibre and B2Gold Sampling Expands Mineralized Zone at the Minnesota Gold-Copper Project, Borosi Concessions, Nicaragua
October 07, 2013  Minnesota News Release Updated Maps
September 19, 2013  Calibre Further Expands 100% Owned Montes de Oro Gold Project
Additional Trenching Intercepts 19.3 metres grading 2.71 g/t Gold
September 19, 2013  Calibre Montes de Oro Map
September 10, 2013  Calibre Mining and B2Gold Sign Definitive Joint Venture Agreement
August 15, 2013  Montes De Oro Trench Location Plan Map
August 15, 2013  Calibre Expands Trench Intercept at the 100% Owned Montes de Oro Target to 52.3 metres grading 7.1 g/t Gold
July 26, 2013  Calibre Provides Update on Borosi Project, Nicaragua.
June 21, 2013  Calibre to Sell a 100% Interest in the Point Leamington Project, Newfoundland to Raystar
June 19, 2013  Calibre Announces Updated NI 43-101 Inferred Resource Estimate of 14.1M tonnes grading 1.86 % Zn, 0.42 % Cu, 0.02 % Pb, 1.07 g/t Au, and 17.12 g/t Ag (6.15 % ZnEq) at the 100% owned Point Leamington Massive Sulphide Deposit, Newfoundland

Previous. All pages. Next. 1. Page 2. 3. 4. 5